Drainage Plan Requirements

Grading & Drainage Report

Any new house construction, or additions to houses that exceed 50% of the original square footage of the house is required to submit a grading and drainage report. The Village has adopted the Arapahoe County Stormwater Management Manual (PDF) for its drainage plan requirements.  

Required Submissions

Two copies of a Phase III drainage report should be submitted with the building permit. No building permit will be issued until the Village has reviewed and approved the grading and drainage report.

Drainage, GESC, and Engineering Plan Requirements

Please use the below approval block and checklists for requirements for drainage, stormwater, and other engineering plans.